ORDER HELP
Joyagoo Warehouse Deadline Planner
Track separate item and unpaid-parcel storage periods, then plan consolidation around the earliest relevant deadline.
On this page
Track item and parcel clocks separately
Joyagoo's published storage page describes 90 free days for an item from the Stored status and 30 free days for a submitted parcel that has not yet been paid for. These are different clocks. Use the actual account deadline as the controlling record and verify any extension or other condition with the platform. The planner adds the stated number of calendar days to a date you enter; it is not an official expiry timestamp.
Build the calendar around the oldest item
Imagine that three products enter storage on 4 December, 12 December and 5 January. The item stored on 4 December has the earliest planning date. Do not restart its clock when the January item arrives. Add each item to your own calendar and identify the earliest relevant date before choosing a consolidation plan.
A practical review schedule
Choose a personal review date comfortably before the account deadline. On that date, inspect the outstanding items, check whether late sellers have dispatched, decide whether any QC questions remain, and request a new freight quote if the parcel composition changes. Leave additional time for support or packing rather than treating the final storage date as your first action date.
When a parcel has already been submitted
A submitted but unpaid parcel is not simply another item in storage. Check the parcel's own status, quote and account messages. The published storage period does not necessarily mean that a particular quote remains available for all of those days. Verify any separate payment deadline before waiting.
If the original plan no longer works
Compare an extension request, a partial shipment and waiting for the remaining item. Extension availability and fees must come from the current official service information. A partial shipment may create additional freight costs but reduce the risk of missing the earliest storage date. Use two current eligible quotes to assess the trade-off, rather than guessing based on weight alone.
Keep dates together with evidence
Record the displayed status, account deadline, date of your observation and any approved extension. Avoid storing sensitive order references in shared browser notes. An actual platform deadline or authorized extension is stronger evidence than a date generated by a local planning tool.
Calculate the price of keeping a delayed item
The additional service schedule lists storage extensions at USD 1.50 per product ID per month, with requests during days 60–90 and a stated six-month maximum storage period. Confirm availability and account terms before relying on an extension. If three eligible product IDs each require one month, the illustrative extension cost is $4.50. Compare this with the extra freight from shipping separately; neither option should be selected solely because the original storage was free. The separate warehouse storage page quotes CNY 10 for 30 days. Keep that reference in its original currency; do not assume the two published schedules are interchangeable or that either is a live offer.
Check the official storage policy ↗
References
mgt.joyagoo.com — How long can the goods be stored in the joyagoo warehouse ↗
Frequently asked questions
Does the 90-day period start when I pay?
The published item policy starts it from Stored; verify the account deadline.
Does a new arrival extend older items automatically?
Do not assume so. Review each item individually.
Can the planner calculate the exact expiry hour?
No. It provides a calendar planning date; the account record controls.